Thursday, 3 July 2014

Regent Park Aquatic Centre: A Pool Design

This project in Regent Park Toronto ON was developed by MJMA is 28,000 square feet. It was completed in 2012 with a price tag of $13,300,000 (construction costs are more expensive in western Canada than they are in central Canada.
Regent Park Aquatic Centre, Toronto, ON. 
Regent Park Aquatic Centre Facade Toronto, ON. 
The pool is large enough for competitions, has a water slide, a tarzan rope, 1 metre diving board,and a family pool with spray features, a whirlpool, ramped accessible entries to all pools, universal change rooms with individual and family change cubicles..
Regent Park Pool, Tarzan rope, Toronto On. 
Regent Park Leisure Pool, Toronto, ON. 
This end of the pool is family oriented and the far end is the previous picture with a Tarzan rope.
A View from the regent Park Aquatic Centre Water Slide Tower Toronto, ON. 
The tower views shows the lap pool closest to the slide with the family pool and spray features in the far end.

Here is how the Regent Park Aquatic Centre is linked to the rest of the complex, Toronto,ON. 
Here is the write up on the Aquatic Centre.

REGENT PARK POOL
Toronto, Ontario
This new state-of-the-art aquatic facility is designed as part of the Regent Park revitalization project.  Regent Park is one of Canada’s largest and oldest public housing developments.  Its revitalization plan includes the demolition of the existing housing and the redevelopment of the area which will increase the density of housing and incorporate mixed social and market geared living units.  Regent Park Pool will be a key component of the community’s reintegration into the surrounding urban fabric, designed to be a community centre not only for Regent Park but a facility accessible to all of Toronto.  The building will incorporate environmentally sustainable strategies and demonstrate the City’s new Green Development Standard.  Some features currently being developed are a green roof system, a thermal energy supply from a new central plant built for Regent Park, natural ventilation and natural lighting to all areas of the building.

Thank you to Group 2 for bringing this facility to my attention.

Another Envelope Concept for Pool and Gym: Sprung

Here is another concept for consideration in the construction of Phase 2. It is Sprung Structures and one is currently being built in Martensville.

Click here to see Collingwood Ontario new arena and pool.

Try here to see a lap pool enclosed with Sprung.

Some more information for Sprung

Performance Arts

Aquatic

Phase 2 Public Meeting

Last night the first meeting was held for those interested in helping build Phase 2: The West Central Community Centre. Here are my notes for the meeting with the information I shared. The next meeting is July 22nd at 7:00 tentatively in the Lounge at the WCEC. (This post has formatting problems; please accept my apologies for the inconvenience.)

1.       Purpose

                    i.            The purpose of this meeting is to familiarize potential volunteers with the necessary information regarding the background work done to date to develop Phase 2; Phase 2 includes an aquatic centre, gym/fieldhouse, and a performing arts centre.

                   ii.            Also covered will be the work necessary to ensure Phase 2 is built and funded in a sustainable and timely manner.

                 iii.            Who’s helping?

2.       Background

                    i.            Kindersley is home to aging facilities including the Norm Ritchie Community Centre and the Kindersley Aquatic Centre. The NRCC was slated for demolition in 2009.

                   ii.            Currently all of the available gym spaces within the community are booked causing programming restrictions.
                 iii.            The Kindersley Inn is the only banquet hall in Kindersley. However, in the last couple of years the Curling Club ice surface and the Co-Op Rink have been used for big celebrations such as KCS’ Grad and Co-Op’s 100th Anniversary.

                 iv.            To address Kindersley’s arts and recreation needs and wants a Needs Assessment was completed which included a lot of community input. A part of this was a survey in which almost 700 people participated.

3.       Current Situation

                    i.            The Kindersley Aquatic Centre is to be demolished.

                   ii.            The NRCC needs a significant amount of work.

                 iii.            All of the gym facilities in Town, including schools and churches, are fully utilized

                 iv.            Regarding the Leaf Your Legacy:
     ·         At the end of 2013 the fund had $550,940
     ·         With matching funds from the Town for the funds raised in 2013 the fund now has $763,040

                  v.            Other Financial considerations:
     ·         $3 million to increase Water Treatment Plant capacity – depends on volumes
     ·         $2.5 million New Fire Hall 2017
     ·         $1 million Ladder Truck 2016
     ·         $11 - $17 million sewage lagoon 2016
     ·         $1.1 million Regional Landfill 2015 ($250k in reserve)
     ·         $600k for Town Square 2016 (Decision to be made)
     ·         Yearly payments of almost $953,000 for water

                 vi.            West Central Events Centre
·         Approaching its stage in life when more maintenance is required

               vii.            Fundraising Activity
·         Klippers
·         Red Lions
·         Fire Hall
·         Health and Wellness Foundation
·         Museum
·         Social Agencies
·         Youth Organizations
·         And ???

              viii.            Group 2 has completed, and it has been received by Council, a Needs and Operational Assessment and you can click here to download it.
·         3 Options are proposed
·         Option A includes an aquatic centre with a 6 lane pool 25 metres long to hold events, a leisure pool, a hot tub, and a water slide, a field house with a regulation size indoor soccer pitch, and a 450 seat theatre and kitchen facilities to host banquets. Also included is space for Town Offices and Great Plains College. The price tag for this project is $65.5 million plus GST. Should Great Plains College not partner than the price tag is $55.6 million
·         Operation Cost Increase: $783,946
·         Option B has the same swimming pool for meets but with a smaller leisure pool and hot tub; a gym, a 300 seat theatre and kitchen facilities to host banquets. Option B also has space for Town Offices and Great Plains College. The cost of Option B is $51.3 million and if Great Plains College does not participate then the price is $41.5 million.
·         Operation Cost Increase: $635,590
·         Option C, is a phased approach starting with the aquatic centre; the aquatic centre has been identified as the most needed facility in West Central Saskatchewan. The aquatic centre includes a 6 lane 25 metre pool, leisure pool, and hot tub. The cost for the aquatic centre is $27.7 million.
·         Operation Cost Increase: $452,254

                 ix.            Partners

·         We have been working hard to develop partners for Phase 2
·         The partners are either operational or capital or both

Great Plains College

·         They would be both an operational and capital partner
·         In one plan they are tenants in the facility with a power engineering lab, workshop lab to be shared with KCS, a kitchen for teaching culinary skills, and their administrative offices would also be a part. They would sell the building on Main St and use the capital for Phase 2.

Sun West School Division

·         An operational partner
·         They can offer “Academies” for both arts and sports

·         Heartland Health Region
·         Operational partner
·         For the delivery of health and wellness programs to residents of Kindersley

·         Regional Municipalities
·         This is a facility to serve all of West Central SK

·         YMCA
·         Phase 2 fulfills their vision and mission but last year they had some HR issues and were not able to pursue what a partnership may look like
·         This has to be revisited to see where the YMCA is now

                  x.            Other Government Funding

·         The Town has been doing our financial work to assess what we need and what we want
·         Government funding on this scale is usually awarded when there are partnerships involved
·         There is limited government funding but we are presenting to the province late summer early fall the Town’s fiscal challenges due to growth, geography, and aging infrastructure

 Some Fundraising Considerations

                    i.            75% - 80% of monies should be raised prior to going public
                   ii.            Government funding is arranged before going public
                 iii.            Big sponsorships are arranged before going public
                 iv.            Telemiracle, as an example, has all of their money for their target arranged prior to going to air; the public appeal puts them over the top

 Some Building/Design Considerations

                    i.            Structural

                                i.            A building with high humidity and in cold weather undergoes a lot of pushing and pulling 
                               ii.            Lots of condensation is created necessitating a strong structural envelope around the pool
                             iii.            There can be no exposed steel, as we have learned, to prevent corrosion and mould. The need for stainless steel is critical
                             iv.            Expense of pool is in the finish with stainless steel, tiles, mechanics, filtration
                              v.            Structural design should drive down operational costs
                             vi.            If a phased approach then how to integrate new facilities with existing?

                   ii.            Programming

                                i.            Understand the type of programming required so it can drive design
                               ii.            What design provides programming flexibility?
                             iii.            How many tanks? Whirlpool, swimming, leisure each requiring different temperatures
                             iv.            The goal is to maximize the use of the facility

                 iii.            Operations

                                i.            What is the relationship between the inside and the outside?
                               ii.            Where does water go?
                             iii.            How do we fix it?
                             iv.            How do I operate it? how much automation? (cutting edge technology at the design stage is usually standard by the build phase)
                              v.            All designs have to be approved by Public Health Inspector. Standards for filtration rooms and drains have become more onerous
                             vi.            How to access the mechanical systems?
                           vii.            What level of certification for operators and staff?

Next Steps 

                    i.            Who is going to be involved?

                                i.            Fundraising Committee – how much can be raised?

                               ii.            Building/Design – what do we need? (we have design concept and  now is the the time to work to make it fit Kindersley)

                             iii.            Terms of Reference – developed in tandem between Town and Committees

                             iv.            Architect of Record

                   ii.            Consensus: which option is to be pursued? Council decision with input from committees (stakeholder groups from all components need to be engaged)
                                i.            ·         Option A includes an aquatic centre with a 6 lane pool 25 metres long to hold events, a leisure pool, a hot tub, and a water slide, a field house with a regulation size indoor soccer pitch, and a 450 seat theatre and kitchen facilities to host banquets. Also included is space for Town Offices and Great Plains College. The price tag for this project is $65.5 million plus GST. Should Great Plains College not partner than the price tag is $55.6 million
·         Operation Cost Increase: $783,946
·         Option B has the same swimming pool for meets but with a smaller leisure pool and hot tub; a gym, a 300 seat theatre and kitchen facilities to host banquets. Option B also has space for Town Offices and Great Plains College. The cost of Option B is $51.3 million and if Great Plains College does not participate then the price is $41.5 million.
·         Operation Cost Increase: $635,590
·         Option C, is a phased approach starting with the aquatic centre; the aquatic centre has been identified as the most needed facility in West Central Saskatchewan. The aquatic centre includes a 6 lane 25 metre pool, leisure pool, and hot tub. The cost for the aquatic centre is $27.7 million.
·         Operation Cost Increase: $452,254

                 iii.            Should a fundraising professional be engaged?

                 iv.            Should the Fundraising Committee establish a “Friends of WCCC”

                  v.            Sign up and consider how you can best serve Phase 2
·         The biggest challenge is us: having the right people doing the right job

Town Staff BBQ Lunch

This afternoon Councillors Biberdorf, Janzen, and Sackville bbqed burgers for the Town's staff. It was a good lunch hour. We have a dedicated staff who go above and beyond many times.
Town Staff Lunch BBQ at the Town Shop. July 3, 2014.
  • Bryce making sure that boxing could continue.
  • Jesse updating Facebook regarding road work.
  • Faye for the extra work she is doing for recreation.
  • Arnelio for the hard work he is doing in Public Works.
We have many staff who treat their jobs like a public service. They get up in the middle of the night to address issues, they open up rooms and more in the middle of their supper, they work in cold weather and cold water fixing water mains, and they get up early in the morning to ensure we have safe and good water.

To all of the staff at the Town of Kindersley, thank you for your hard work!
Town Staff Lunch BBQ at the Town Shop. July 3, 2014

July Schedule

This is my tentative schedule for July. Like the other months there will likely be changes.
July 1 – Canada Day (Museum)

July 2 – Phase 2 Public Meeting

July 3 – Staff BBQ

July 4 – Mayor’s Hours

July 7 – Mayor’s Hours

July 8 – HR

July 9 – Q & A with Chamber of Commerce

July 11 – Mayor’s Hours

July 14 – Mayor’s Hours

July 14 – Council Meeting

July 15 – SUMAssure (Regina)

July 15 – Health Meeting – Tentative (Regina)

July 16 – Unavailable

July 18 – Mayor’s Hours

July 20 – Mayor’s Hours

July 23 – WCMGC (Luseland)

July 24 – Premier’s BBQ (Rosetown)

July 25 – Mayor’s Hours

July 28 – Mayor’s Hours


July 28 – Council Meeting

Canada Day Celebration 2014

Once again the Museum hosted the Canada Day celebrations. There was a terrific turn out with lots of activities.

The RCMP, Legion, and the Air Cadets provided colour guard and the Youth Mayor and myself said a few words. From there everyone went inside for cake.
Cake at the Museum. July 1, 2014
The door in the far end opened to the grounds and a host of activities for all ages.
Entering the grounds for fun, games, exhibits, food, and chats. July 1, 2014
It was a good day with funds raised for: Creative Kids, Crisis Centre, and Phase 2. More than 30 people tried to dunk me and it seems to me most succeeded. Yes, the water was cold.
New Life Church brought their Bouncy Castles. July 1, 2014

Creative Kids ran the bbq. July 1, 2014
The Masons provided ice cream. July 1, 2014
It was a good day and thank you to all of the volunteers for making at a success!

Canada Day Remarks 2014

Below is the texts of the remarks I delivered at the Canada Day celebration. The notes guide my speaking but I do not read them so they may have been expressed differently at the celebration.

Remarks

·        Good morning Kindersley! Happy Canada Day!

·        On behalf of the Town of Kindersley welcome to Canada’s 147th birthday

·        Canada has done much but is doing more

·        We are a beautiful country with picturesque scenes but we are also a country that has health care for all

·        We are a just country that lives by the rule of law and cares for those less fortunate

·        Canada is a country in which almost everyone here has moved here for some type of fulfillment. It could be economic, cultural, religious, and more

·        And Canada is a country that works for healthy relationships; peace. We work together across the country to make life better here and around the world

·        These are the four pillars of community: beauty, justice, fulfillment, and relationships
Visiting and eating cake at the Canada Day celebrations. July 1, 2014
·        Here in Kindersley I see a community building these pillars

·        Groups like the Motherwell Walking Trail Committee developing a little oasis for us to enjoy

·        The Health and Wellness Foundation working for health care and agencies like SPOKES and the Health Region who provide the health and wellness care we all need at some point in our lives

·        We take for granted our Protective Services staff including the RCMP, Bylaw, and Fire for their work towards justice

·        Many people devote their time and money so we have opportunities to grow and learn to be fulfilled

·        The opportunities to be fulfilled range from business ownership to spiritual to recreation and leisure to culture to social services

·        And finally those groups who bring us together like the respective men’s and women’s golf leagues, neighbourhood groups, and other places people gather to visit and talk.

·        A lot of different things take place to make a thriving and dynamic community

·        On behalf of the Town of Kindersley I want to thank all of the people who enrich our community so it is beautiful and just where people have the opportunity to be fulfilled and have good relationships

·        Thank you for making Kindersley a great place to live!

·        Happy Canada Day!

Girls Provincial Ball Tournament

Last week Kindersley hosted the provincial tournament for 11 - 12 year girls in the Squirt Division. There were a number of teams from around the province including Macklin, Unity, Humboldt and more.
Squirts Provincial Tournament in Kindersley. June 27, 2014
The turnout was strong and the ball was pretty good.
Kindersley Crowd enjoying the game. June 27, 2014
Thank you to the organizers for pulling together a well run tournament.

Without volunteers and their energy we as a town would be much poorer.

Rutley Crescent Neighbourhood BBQ

Talk about a great neighbourhood. The neighbours on Rutley Crescent organized a neighbourhood BBQ on June 24th. They had a terrific turnout with good food and conversations.
Rutley BBQ on a good weather day. June 24, 2014
Children played and neighbours caught up. For children of all ages on the Fire Trucks took everyone who wanted for a ride.
Kids riding the Fire Truck. June 24, 2014
Everyone seemed pretty happy getting a view from the inside the truck.
Riding the fire truck. June 24, 2014
It was all fun. If your neighbourhood would like to do the same please contact the Town Office if you need your street closed. Rutley's was in their little park and they used the Co-Op bbq. Organizers asked the fire department if the truck could be present.

Housing Authority Retirements

On June 24th I attended the retirement party of two members of the Housing Authority, Dave and Wayne (not sure how to spell their last names. Both men have served on the Authority for 5 years. Thank you Dave and Wayne for your service to Kindersley!
Dave, Wayne, and Peter Walker the Chair. June 24, 2014
The Authority has two new members replacing Dave and Wayne and were not able to attend the celebration due to work.

Thank you to the Authority for their ongoing commitment to housing in Kindersley.
Members of the Housing Authority including the General Manager Mavis. June 24, 2014